The flow modifications include (1) increases in area and magnitude of high wind speed (HWS) zones, (2) the formation of a pronounced low wind speed (LWS) zone on the leeward side of the 'liftup' building, and (3) a weakened LWS zone in the upstream direction of the 'lift-up' building.